Phase 2 of the Grenfell report due on September 4th 2024 is long awaited across the industry. With the release of the report imminent, Nicola John, our MD at Fire Door Maintenance (FDM) reflects
Phase 2 of the Grenfell report due on September 4th 2024 is long awaited across the industry. With the release of the report imminent, Nicola John, our MD at Fire Door Maintenance (FDM) reflects
Fire Door Maintenance (FDM) is delighted to announce that the Association for Composite Door Manufacturers (ACDM) has unanimously voted for FDM to be its training partner. The decision was made at ACDM’s recent
By Nicola John, Managing Director, FDM — Traditionally, each segment of the building industry—design, construction, inspection, and maintenance—has operated independently and within its silos. Why does that matter? Important information can slip through
By Nicola John, Managing Director, FDM—Landlords have many responsibilities, including the legal responsibility of providing a safe environment for their tenants and the legal duty to maintain and repair properties to the correct
By Nicola John, Managing Director, FDM — Choosing a private and specialised training provider over a traditional college course could be ideal for those working in a rapidly evolving industry with a changing
By Nicola John, Managing Director, FDM — During the Construction Leaders' Summit 2023, Dame Judith Hackett discussed the urgent need for a proactive approach to building safety driven by collaboration, transparency, and a
Fire Safety (England) Regulations 2022 Enforced in January 2023, the Fire Safety (England) Regulations 2022 regulations set new legal duties for those who own or manage multi-occupied residential buildings over 11m high. These
We are delighted to share that we have had a successful start for FDM. Our mission is to elevate Fire Door safety standards and support organisations in navigating the changing regulatory landscape. That mission