Phase 2 of the Grenfell report due on September 4th 2024 is long awaited across the industry. With the release of the report imminent, Nicola John, our MD at Fire Door Maintenance (FDM) reflects
Phase 2 of the Grenfell report due on September 4th 2024 is long awaited across the industry. With the release of the report imminent, Nicola John, our MD at Fire Door Maintenance (FDM) reflects